First Article Inspection (FAI) Services

Documented AS9102 first article inspection — ballooned drawings, full dimensional verification, and material and special-process certification on the first part, before the lot ships.

Request a Quote Email support@quickbrownfox.co
Service Overview

Prove the part before you commit the lot

First Article Inspection is the documented proof that a manufacturing process produces a part that meets every requirement on the drawing. Instead of sampling a finished lot, an FAI verifies the first production part against each characteristic on the print — every dimension, tolerance, note, finish, and material call-out — so a contracting officer, prime quality team, or program office can release the run with evidence, not assumption. Quick Brown Fox Solutions delivers First Article Inspection alongside prototype machining and production machining through an ISO 9001:2015 certified production network. QBF carries UEI MA3DSJEPMFQ8 and CAGE 201W8.

AS9102

What an AS9102 FAIR contains

Form 1 — Part Accountability

Part number, revision, drawing, and assembly accountability, tying the report to the exact configuration being verified.

Form 2 — Materials & Processes

Material certifications, special-process certifications (heat treat, plating, coating), and the functional test records the drawing calls for.

Form 3 — Characteristics

Every ballooned characteristic on the drawing, each with its specification and the actual measured result from the first article.

Process

From ballooned drawing to signed report

The report starts with a ballooned drawing — every dimension, tolerance, GD&T callout, note, and finish requirement is numbered so nothing is missed. Each ballooned characteristic is then measured on the first production part using calibrated equipment: benchtop optical comparator and calibrated hand gauging in-house, with CMM verification available through the production network for complex GD&T and datum schemes. Results are recorded against the specification on Form 3, and any nonconformance is flagged with disposition before the report is released.

The finished package bundles the ballooned print, the completed AS9102 forms, material and special-process certificates, and a certificate of conformance. Because the program, tool list, setup sheet, and inspection plan are archived under the network’s ISO 9001:2015 quality system, the same job repeats without a rebuild — and re-verifies cleanly on the next revision or delta FAI.

When It's Required

When you need a First Article Inspection

An FAI — full or partial (delta) — is typically triggered by a new part number, a drawing or design revision change, a change in manufacturing source or location, a change in process, tooling, or material, or a lapse in production of two years or more. It is a common flow-down on aerospace (AS9100), defense, and prime-contractor purchase orders, and is frequently paired with tight-tolerance work and source inspection. If your solicitation calls for AS9102, PPAP-style documentation, or DCMA source inspection, send the drawing and the clause and we will scope it.

Related Services

Explore more capabilities

Prototype Machining

First-article work and low-volume builds on the same platforms that scale the part.

Tight Tolerance Machining

Routine plus/minus .0002" with the documentation critical features demand.

Production Machining

Documented, repeatable lots with inspection records on every run.

Custom CNC Machining

Made-to-print machined parts in a wide range of materials.

Precision Machining

Optical-comparator and calibrated-gauge verification on every part.

All CNC Services

The full Quick Brown Fox Solutions service line.

Need a first article quoted, built, and documented right?

Request a Quote